This project is currently at the design stage. Just some of the specific issues to be faced in designing this expansion and enhancement to the Creston and District Community Complex Facility are:

  • Providing a seamless connection between the existing and new facilities.
  • Producing a facility which will specifically cater to the needs of the stakeholders and immediate population in the surrounding area.
  • Providing an energy efficient building.
  • Successfully providing a facility which respects the current and future usage trends in aquatic facility design/fitness/therapy.
  • Creating a building that would be a maximum revenue generating facility with minimum operational costs - to be as self-sustaining as possible.
  • Designing an extension to the facility that will successfully "blend" with its surroundings and compliment the adjacent buildings.
  • Provide continuity of programming with a minimum disruption and shutdown period.

Details:

Special Features:

  • 1 m diving
  • Lap lanes in leisure pool
  • Tee-cup
  • Spray arch
  • Tots area with sprays
  • Lazy River
  • Hot Tub
  • Waterslide
  • Bleacher seating
  • Pool side viewing terrace
  • Ramp entry
  • Juice bar
  • Climbing wall
  • Multi-purpose spaces
  • Office and admin space
  • Walking track will be accommodated.
  • Curling rink options will be explored.
  • Allowance for future expansion to end of the arena.
  • Pool built with wood beams and wood used for cosmetics wherever
    possible.

Completion Date: September 2009

Construction Cost Estimate: $18.2m

Addition of a 25m 5 lane lap pool and leisure pool

 

 