Medicine Hat Leisure Complex
Medicine Hat, Alberta
The
Medicine Hat Family Leisure Centre provides an opportunity for swimming,
skating, and outdoor sports in one of the most progressive recreational
facilities in the province of Alberta. Vic Davies Architect Ltd.
provided specialist pool consultancy services for this oasis
in the prairies.
The competition pool with its two bulkheads and moveable pool floor
allow for endless variations in the pool set up and use. From 50m
and 25m competition and practice using the Olympic style starting
platforms and touch pads, to synchronized swimming, or a multi-purpose
use set up (shallow depth lessons, lap swimming, and diving
all at once). This flexibility ensures maximum use of the pool tank.

The 340 square metre leisure pool and the separate 27 square metre
tots pool provide unbounded play possibilities. Both pools
have a warmer more tropical water temperature than the
lap pool (approximately 30°C). The freeform shape of the pool
offers out-of-the-way corners for playing and relaxing, while the
zero depth beach entry, with its softly lapping waves, affords easy
access.
The
play value and therapeutic benefits of the moving water soon become
evident to those using the leisure pool. Whether being massaged
by one of the water sprays or playfully splashing a friend, walking
upriver in the lazy river or drifting gently down stream, the pool
offers something for swimmers of all ages and abilities.
Reflecting the unique landscape of Southern Alberta, soaring pelicans,
cottonwood trees, and a rattlesnake waterslide, the themed décor
transforms the aquatic centre into a wilderness adventure. The structural
columns between the leisure and competition pool have been metamorphosed
into full size cottonwood trees, while other older gnarled cottonwood
stumps are strategically located around the pool. Panoramic
murals of prairie wheat fields, river banks, and hoodoos offer endless
horizons for bathers. The décor provides a naturalistic,
educational, and legendary look at the area.

Details:
|
Special Features:
- Ozone water treatment
- Two movable bulkheads
- Movable floor
- Wave machine
- 1 and 3 metre spring board diving
- 5 metre dive tower
- Rapids channel
- Bubble pit
- Tots pool
- Water slide
- Fountain sprays
- Raindrop
- Steam room and swirlpool
- Poolside viewing/café terrace
- Family change rooms
|
|
Completion Date: May 2000
|
|
Overall Project Construction
Cost: $15 million
|
|
8 lane 50 metre competition pool
Separate leisure pool
Separate tots pool
|
|